Baytur Main Page
 
 
The Palm Jumeirah Shoreline Apartments

The Palm Jumeirah Shoreline Apartments

Contract Information

Reference No. : a / 62
Job No : 154 / UAE – 01 / PC
Contract Name : The Palm Jumeirah Shoreline Apartments
Country : United Arab Emirates
Client : Nakheel
Consultant : Turner Construction International – ACE, Associated Consulting Engineers International
Final / Latest Contract Price : US $ 225.974.229
Starting Date : 20 March 2004
Completion Date : 29 February 2008

General

The Shoreline Apartments Project includes the construction of 10 apartment buildings and 5 Clubhouses on the Jumeirah Palm Island in Dubai.

Further information on the contract is as follows:

1. Services being provided :

Site works including soil improvement, excavation and backfilling, and anti-termite treatment.
  • Structural works including concrete works and concrete piling works.
  • Architectural works including finishing works.
  • Mechanical works including domestic cold & hot water systems, fire fighting system, sanitary waste & vent system, rain water system, and HVAC system.
  • Electrical works including distribution boards, motor control center, lighting and fan points, luminaries, wiring and accessories, electrical connections, door bell system, earthing system, lightning protection system, telephone system, fire alarm and detection systems, intercommunication system, and CATV system
2. Facilities being constructed :

Buildings to the Sea Side :Package 1
  • Building Type A: consisting of 12 floors x 2
  • Building Type B: consisting of 11 floors
  • Building Type C: consisting of 10 floors
  • Building Type D: consisting of 10 floors
  • Building Type E: consisting of 11 floors
  • Building Type F: consisting of 12 floors
  • And the Club House which will be built in the neighbourhood of the buildings at the Sea Side.
Buildings to the Canal Side:Package 3
  • Building Type A: consisting of 12 floors x 2
  • Building Type B: consisting of 11 floors
  • Building Type D: consisting of 10 floors
  • Building Type E: consisting of 11 floors
  • And the Club House which will be built in the neighbourhood of the buildings at the Sea Side
3. Major work items :
  • Concrete works: 232.652 m3
  • Piling: 146.280 mt.
  • Thermalite Wall: 360.600 mt.
  • Wall Ceramic Tiles: 151.000 m2
  • Floor Ceramic Tiles: 195.000 m2
  • Epoxy Floor Covering (Car-Park): 80.400 m2
  • Painting: 916.000 m2


 
© 2017 SAUDI ARABIAN BAYTUR