Project start date : 30.8.2022
Estimated project completion date : 29.2.2024
The Project Covered Area (SIZE) : is 4-meter width total length of the skywalk 1006-meter, 6-meter width total length of the skywalk 322 meter.
Location : Riyadh
Client : KAFD
Consultant : Parsons
Architect : Design & Built

img

 

 

  • Design, Engineering, Fabrication, Supply, Installation, Liable of defects and guarantee of the complete 39 Skywalks bridges across the KAFD leaf, which are at the various stages of completion. There are 21 skywalks that are substantially completed, 18 sky walks need to be constructed. These skywalks are designed to be serviced through MEP utilities provisions form the adjacent parcels. SA BAYTUR to coordinate with all stakeholders to ensure the correct installation of all skywalks, in compliance with structural and MEP services.
  • The scope of work includes but not limited to the review of all available design drawings and specifications and organize and structure available data to obtain clear understanding of what information is available and required to progress the works.